A risk assessment is not a binder created once to pass an audit. Under ISO 45001 Clause 6.1.2 and HSE UK guidance, it is a live decision tool that tells crews what can injure them today and what exact barriers must be verified before work begins.
The 5 Steps of a Practical Risk Assessment
- Identify the real hazards: walk the actual work area, inspect equipment, review Safety Data Sheets (SDS), and ask the technicians who perform the task daily.
- Decide who might be harmed and how: include direct workers, nearby subcontractors, visitors, and maintenance crews entering during night shifts.
- Evaluate risk and select controls: score initial Likelihood and Severity using the 5x5 Risk Matrix Calculator, then apply controls starting from Elimination and Engineering rather than jumping straight to PPE.
- Record findings and brief the crew: document the controls, residual risk score, named owner, and share them during the morning Toolbox Talk before starting work.
- Review and update: revisit the assessment whenever equipment, weather, subcontractors, or work scope changes, or immediately after any near miss or incident.
What Separates a Real Risk Assessment From Copy-Paste Paperwork
- Hazards match the exact site location (for example, live 11 kV cable crossing a trench rather than generic “electrical hazard”).
- Every control names a verifiable physical barrier (such as a 1.1m guardrail or LEL reading below 1 percent) instead of vague wording like “be careful.”
- Residual risk is re-scored honestly only after the new controls are physically verified on site.
Free Word Templates for This Guide
- 5x5 Risk Assessment Template ISO 45001 (Editable Word .docx)
- Job Safety Analysis (JSA) Template (Editable Word .docx)
- Browse the complete HSE template library
Related Guides in SafetyPro HSE
- Field Risk Matrix Methodology (ISO 45001)
- Hierarchy of Controls Explained
- Excavation and Trenching Safety Guide