Hot Work Permit
A complete two-page permit: work details, 12-point checklist, gas testing, fire watch, authorization and closure.
- 12-point pre-work checklist
- Gas log O₂ / LEL / H₂S / CO
- Five-party authorization & closure
Fourteen Word templates built with the SafetyPro identity: permits, JSA, 7-page Enterprise Risk Assessment, discipline Method Statements & ITPs (Excavation, Electrical, Mechanical, Civil), and the unabridged 12-page Construction Project HSE Plan. Three languages, A4, editable.
A complete two-page permit: work details, 12-point checklist, gas testing, fire watch, authorization and closure.
Task steps, hazards, controls and residual risk, with a 5×5 matrix, crew briefing record and revision log.
A full risk register with probability, severity, score, additional controls and residual risk, plus an action plan and approval.
Field permit built on OSHA 1926 Subpart P: Type A/B/C soil classification and slope table, 10-point pre-entry checklist, daily shift log and sign-off.
Complete lift plan under OSHA 1926 Subpart CC and ASME B30: gross vs net load math, sling angle derating table, 10 pre-lift checks and 4-party approval.
ISO 45001 Clause 10.2 investigation report: first-hour evidence log, evidence-backed 5 Whys table, Ishikawa 6Ms check and closed-loop CAPA tracker.
OSHA 1926 Subpart L scaffold checklist: 12 points covering base plates, planks, guardrails, ties, and access, plus weekly inspection log.
Structured daily safety briefing log: task hazards, active PTW controls, required PPE checklist, and crew commitment sign-off for 12 workers.
Complete 7-page consultant-ready dossier: cover & document control, scope & methodology, 5x5 matrix with likelihood/severity & escalation rules, hierarchy of controls, landscape 14-column register covering 8 core activities + editable blank rows, CAPA tracker, and final sign-off.
Engineering-grade 7-page RAMS submission: CAT & Genny scanning, Type C sloping/Trench Box shoring, 10-stage landscape execution sequence with Hold Points, quantitative ITP criteria (1.5x pressure test, 95% MDD compaction), and specific trench rescue procedures.
7-page electrical RAMS dossier: LOTO & NFPA 70E Arc Flash PPE, 5kV Megger IR & 0.1Hz VLF testing, DLRO contact resistance, busbar torquing, and <= 1–5 Ohm earthing.
7-page mechanical RAMS dossier: pump/chiller rigging, laser shaft alignment, WPS welding & NDT (RT/UT/PT), star-pattern flange torquing, and 1.5x hydro-test.
7-page structural RAMS dossier: formwork/falsework shoring, rebar & couplers, joint Pour Card gate, slump/temp/cube sampling, curing, and safe stripping.
Complete 12-page unabridged consultant submission: HSE Policy & KPIs, Staffing Ratios & RACI, Training Matrix, 7-Type PTW Register, High-Risk & Heat Stress Controls, Subcontractors, Welfare & ISO 14001, Landscape Audit/NCR Tracker, Emergency & RCA, and Pre-Mob Stamp.
Download the full three-language pack, including the JSA and risk assessment Excel versions.
DOCX + XLSX · A4 · editable